Construction of a new landfill for Muscat, the capital of Oman


Construction of a leachate treatment plant


Construction of the  landfill gas collection pipes and gas collection substations for the  horizontal and vertical gas extraction system


Construction of a receiving area with staff facility building, workshop, garage and weighing facility


Scope of work: Capacity building, site supervision; Resident engineer for Fichtner Muscat


Deposit area, total:


466.500 m²


  • 1. Section:



78.000 m²



Deposit volume, 1. Section:



1.275.000 m³



Leachate treatment:



Evaporation pond



Base lining system:





  • Landfill:



Asphaltconcrete, 2 liner, wearing course 8 cm,

sealing course 6 cm


Evaporation pond:


HDPE liner, 2,5 mm, 2 liner, leakage control



Client:



Muscat Municipality, Sultanate of Oman



Project Management:



Fichtner GmbH & Co. KG, Germany



Design:



ICP GmbH, Germany



Contractor:



STRABAG Oman LLC


IMG_0015 IMG_0023 IMG_0011

Landfill Al Multaqaa, Al Amerat, Muscat, Oman