• Construction of a new landfill for Muscat, the capital of Oman

  • Construction of a leachate treatment plant

  • Construction of the  landfill gas collection pipes and gas collection substations for the  horizontal and vertical gas extraction system

  • Construction of a receiving area with staff facility building, workshop, garage and weighing facility

  • Scope of work: Capacity building, Site supervision; Resident engineer 

Deposit area, total: 466.500 m²
1. Section: 78.000 m²
Deposit volume, 1. Section: 1.275.000 m³
Leachate treatment: Evaporation pond
Base lining system:  
Landfill: Asphaltconcrete, 2 liner, wearing course 8 cm,sealing course 6 cm
Evaporation pond: HDPE liner, 2,5 mm, 2 liner, leakage control

Client: Muscat Municipality, Sultanate of Oman
Project Management: Fichtner GmbH & Co. KG, Germany
Design: ICP GmbH, Germany
Contractor: STRABAG Oman LLC